Hd4070 process sequence – continued – Hypertherm HD4070 Rev.1 User Manual

Page 173

Advertising
background image

5-10

HyPerformance HD4070

Instruction Manual

MAINTENANCE

HD4070 process sequence – continued

Continued from previous page

State 5 – Pilot arc

• Gas console set to state 2 (ignitors ON).
• Waits for current.
• Pilot arc will timeout in 1 second if no current is detected.

State 6 – Transfer

• Waits for transfer signal.
• Gas console set to stage 3 (ignitors off).
• Transfer will time-out in 2 seconds

(default value), it can also be set for 0.3

State 7 – Ramp-up

• Gas console sets state 5 (steady state)

after pierce delay timer expires.

• Machine motion output ON.

State 8 – Steady State

• Steady state current maintained.
• Waits for cycle start to be removed.

State 9 – Ramp-down

• Rampdown gas and current.
• Gas console set to state 6 (rampdown).

State 10 – Final ramp-down

• Choppers turn OFF.
• Gas console set to state 0 (all outputs OFF).

State 11 – Auto OFF

• Fan and contactor timers start.
• Start signal OFF.

Pilot current detected

Transfer complete

Ramp-up complete

Cycle start removed

Ramp-down complete

Advertising