Preventive maintenance master schedule – Hypertherm HD4070 Rev.1 User Manual

Page 215

Advertising
background image

5-52

HyPerformance HD4070

Instruction Manual

MAINTENANCE

Preventive Maintenance Master Schedule

Daily:

• Verify proper inlet gas pressure.

• Verify proper gas flow settings. – Mandatory at every consumable change.

• Inspect torch and replace consumables as needed.

Weekly:

Week

Jan

Feb

March

April

May

June

July

Aug

Sept

Oct

Nov

Dec

1

2

3

4

5

Bi-Annually:

Year

1

st

Service

2

nd

Service

• Clean power supply with dry, oil free compressed air or vacuum.

• Verify cooling fans are working properly.

• Clean torch threads and current ring.

• Verify proper coolant level.

Annually:

Year

• Replace service parts per the Service Part Replacement Schedule.

• Replace service parts per the Service Part Replacement Schedule.

Advertising