Hypertherm HD4070 Rev.1 User Manual

Page 191

Advertising
background image

5-28

HyPerformance HD4070

Instruction Manual

MAINTENANCE

Power distribution board PCB4 status indicators

0 4 1 6 1 0 R A . e p s

D1

D3

D4

D5

Notes:

When circuit breaker CB1 is switched ON, LEDs D3-D5 will illuminate and stay illuminated.

To measure voltages at the power distribution board, find fuses F1, F2 and F3. When the power supply is
energized, take measurements from the top of each fuse to chassis ground, and then from the bottom of
each fuse to chassis ground. Measurements should be as follows:

F1:

240 VAC

F2:

120 VAC

F3:

24 VAC

If voltages are not present, or incorrect at one or more of these points, disconnect power and troubleshoot
fuses and associated pins, connectors and wiring between power distribution board connector J10 and
control transformer secondary T1.

Also, check wiring and connections between T1, CB1 and CON1.

Power distribution PC board LED list

LED

Signal description/ Function

D3

240 VAC Out

Power indicator

D4

120 VAC Out

Power indicator

D5

24 VAC Out

Power indicator

Advertising