Working with the tnc 124 – first steps – HEIDENHAIN NC 124 User Manual

Page 17

Advertising
background image

2

Working with the TNC 124 – First Steps

TNC 124

17

Move the axes in the displayed sequence across the reference marks.

2

Switch on the TNC and the machine tool.

0

ä

1

M E M O R Y T E S T

P O W E R I N T E R R U P T E D

CE

R E L A Y E X T. D C V O L T A G E M I S S I N G

Clear the TNC message indicating that the power was interrupted.

The internal memory of the TNC is checked automatically.

Please wait...

C R O S S O V E R R E F E R E N C E M A R K S

For each axis:

Press and hold suc-

cessively:

Cross the reference marks in any sequence:

Press the machine axis direction button until the moving

axis disappears from the screen.

Sequence in this example: X AXIS, Y AXIS, Z AXIS

X+

´

Y+

Z+

´

NC

or

or

Switch on the control voltage.

The TNC automatically checks the function of the EMERGENCY STOP button.

The TNC 124 is now ready for operation in the
MANUAL OPERATION

mode.

Working with the TNC 124 – First Steps

Before you start

You must cross over the reference marks after every switch-on.

From the positions of the reference marks, the TNC automatically re-

establishes the relationship between axis slide positions and

display values that you last defined by setting the datum.

Setting up a new datum point automatically stores the new relation-

ship between axis positions and display values.

Switch-on

Move the axes in the displayed sequence across the reference marks

Advertising