Verify drive operation – Yaskawa CM092 User Manual

Page 9

Advertising
background image

Installation 1-4

‹

Verify Drive Operation

1.

Connect power to the Yaskawa AC drive and verify that the drive functions correctly.

This includes running the drive from the operator keypad. Refer to the appropriate drive technical manual for information on connecting
and operating the drive.

2.

Remove power from the drive and wait for the charge lamp to be completely extinguished.

Wait at least five additional minutes for the drive to be completely discharged. Measure the DC bus voltage and verify that it is at a

safe level.

Dangerous voltages in excess of 400VDC (230V drives) or 800VDC
(460V drives) are present at the DC bus terminals of the drive.

WARNING!

Advertising
This manual is related to the following products: