Scheduled maintenance – ZOLL Thermogard XP IVTM System Operation Manual User Manual

Page 134

Advertising
background image

Maintenance

4

Scheduled Maintenance

The following table lists scheduled maintenance tasks for the System. Detailed
procedures for some of these tasks are listed later in this chapter.

Table 8-1. Scheduled Maintenance.

Item Frequency

Maintenance

Task

Coolant reservoir

Before each use

Inspect and refill with distilled water to
indicated line if necessary.

Condensate pan

After each use

Inspect. Empty condensate if necessary (refer
to the “Clean Console and Condensate Pan
section of this chapter).

Refrigeration condenser
filter

Every 6 months

Inspect the filter and replace if necessary
(refer to the “Inspect/Replace Condenser
Filter
” section of this chapter).

Roller pump

Monthly

Clean rollers and tubing path with cloth
moistened with water.
Clean rollers and apply light lubri-cating oil if
rollers have been in contact with saline
solution.

Coolant

Annually

Drain and refill with new coolant mixture.

Power cord

Annually

Inspect for wear or damage.

Temperature accuracy

Annually

Perform a temperature accuracy test (refer to
the “Temperature Accuracy Test” section of
this chapter).

NOTE TO INFECTION CONTROL:

50% propylene glycol coolant has been evaluated for antimicrobial
effectiveness and determined not to promote growth of gram negative rods,
gram positive cocci, or yeast microbes. 50% propylene glycol was found to
be comparable to 70% isopropyl alcohol.

600479-001 Rev 2 134/147

Advertising