ZOLL Thermogard XP IVTM System Operation Manual User Manual

Page 72

Advertising
background image

Operation

41

Figure 4-48. Route the Tubing Out of the System.

21.

Lift the saline container off the hook and slip the insulating jacket around
the container. Carefully close the hook-and-loop fasteners at the top and
bottom of the jacket. Rehang the container on the hook.

22.

When the self tests are completed and the Start-up Kit is loaded and
primed, the System will enter STANDBY. The System is ready to be
connected to the patient.

Figure 4-49. STANDBY Screen – T1 Probe Not Connected.

600479-001 Rev 2 72/147

Advertising