ZOLL Thermogard XP IVTM System Operation Manual User Manual
Page 58
Advertising
Operation
27
message will be displayed. If this occurs, refer to Chapter 6–Alarms and
Corrective Actions for assistance. At the end of the self-test there will be
two short beeps.
Figure 4-23. Self-Test Screen.
6.
When the self-test is finished, the System Set Up screen displays the
message “Bath Pre-Set?”
Figure 4-24. System Pre-Cool?
7.
To start cooling or heating the coolant reservoir immediately, choose the
desired option and press the “Press for Menu/Enter” knob (the “knob”)
once to enter the selection. If you do not wish to begin cooling or
warming the coolant reservoir now, choose “None” and press the knob
once to enter the selection.
600479-001 Rev 2 58/147
Advertising