Start-up kit – ZOLL Thermogard XP IVTM System Operation Manual User Manual
Page 21
Advertising
Introduction
9
Figure 2-6. Prime Switch
.
Start-up Kit
The Alsius start-up kit contains the sterile disposable components for this
system. Each kit contains a heat exchanger coil, air trap, saline coolant delivery
lines, saline container connectors, catheter connectors, and the roller pump
tubing. These components are described in detail in later chapters of this
document. The components in the start-up kit are designed to operate
continuously for seven days, after which they must be replaced.
Figure 2-7. Start-up Kit.
600479-001 Rev 2 21/147
Advertising