ZOLL Thermogard XP IVTM System Operation Manual User Manual

Page 66

Advertising
background image

Operation

35

The Alsius Start-up Kit

6.

Open the System Start-up Kit. For convenience and sterility, all items in
the kit are preconnected.

Figure 4-38. System Start-up Kit.

7.

Insert the heat exchanger coil into the coolant well.

Figure 4-39. Installing the Heat Exchanger Coil.

8.

Temporarily slide the air trap into the holder.

600479-001 Rev 2 66/147

Advertising