ZOLL Thermogard XP IVTM System Operation Manual User Manual

Page 68

Advertising
background image

Operation

37

Figure 4-41. Lift the Pump Rollers Handle.

11.

Place the flanged connector of the pump tubing into the slot on the right
side of the pump head.

1. Place flanged connector

into socket on right hand
side of pump raceway.

Figure 4-42. Flanged Connector Fits Into Recess.

12.

Load the pump tubing around the rollers and into the channel of the
pump head. You must turn the handle counterclockwise as you feed the
tubing into the channel. Press down firmly on the tubing until it settles
into the bottom of the channel. Once the tubing is installed, press the
handle down onto the rollers until it presses into its detent.

600479-001 Rev 2 68/147

Advertising