Figure 570-4 – ADC Soneplex Broadband System User Manual

Page 237

Advertising
background image

ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance

2-214
© 2000, ADC Telecommunications, Inc.

DLP-570

Page 4 of 18

7. To start a test, set the Measurement field to START. The RTAU waits for pattern sync or

frame sync (for framed patterns) before beginning measurement (see

Figure 570-15

). After

syncing, the test begins and the Measurement display changes to RUNNING.

8. As a test progresses, the results are displayed on the RTAU Config screen, in the 'Error

Counts' and 'Elapsed Time' columns.

9. To terminate a test, set the Measurement field to STOP. Setting the Mode field to

DISABLE also stops any measurements in progress and terminates the test.

10. To end a test session and restore the tested circuit to normal operation, set the Mode field to

DISABLE.

Stop! You have completed this procedure.

14866-A

RTAU CONFIG

EQUIPMENT SETUP

===============

Current User : CRAFT Test Circuit: 1-1
Line Code : INTERNAL Mode : DISABLE

SIGNAL GENERATOR SETUP
======================
Pattern Type : QRS -------------------------------------
Frame Format : UNFRAMED
Loop Code : NONE ---------------

BIT ERROR SETUP Error Counts Status Elapsed Time
=============== ============ ====== ============
Error Count : 0 Data : F Sync: ES :

Error Rate : OFF BPV : P Sync: EFS:

Error Locn : N/A Frame: RAI :

CRC :

COFA :

Test Timeout : 60 Measurement : STOP

In Minutes

Press CONTROL-A For Assistance

Figure 570-4. RTAU Config Screen

(Showing Defaults for Screen With Line Code Field Set to INTERNAL)

Advertising