ADC Soneplex Broadband System User Manual

Page 49

Advertising
background image

ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance

2-26
© 2000, ADC Telecommunications, Inc.

NTP-011

Page 2 of 2

Do Items Below in The Order Listed

For Details Go To

7. Clear Alarm History.

DLP-527

8. Enter Target Identifier and set date and time now or during

provisioning (the turn-up process).

DLP-528

9. Configure DS3 MUX as required.

DLP-529

10. Configure RLX or RLXIOR modules as required.

DLP-534

or

DLP-533

11. Check RLX voltage to repeater.

DLP-567

12. Connect the test equipment at both ends of the system and perform

an end-to-end test.

DLP-522

13. If the DS3 MUX protect module is installed:

• Execute Force/APS commands through the Craft Interface.

DLP-537

Perform Manual (Force) Switch to Protect test on DS3 MUX
module.

DLP-511

• Perform APS test on DS3 MUX module.

DLP-512

14. At both ends of the circuit, make any necessary cross-connects at

the DSX.

DLP-569

15. Log off from the Craft Interface system.

DLP-564

16. Complete assignment forms and update office records as required

by local procedures.

DLP-523

Advertising