ADC Soneplex Broadband System User Manual
Page 73
Advertising
ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
2-50
© 2000, ADC Telecommunications, Inc.
DLP-512
Page 2 of 2
11. Perform the end-to-end test and verify error-free data.
ODS2 Distribution System and QFLC/QLX Chassis End-to-End
Tests
HLXC and HLXR End-to-End Tests
DLX- or RLX-Equipped Circuit End-to-End Tests
12. Insert partially removed DS3 MUX back into the chassis until it is properly seated.
13. Verify that STATUS indicator on offline DS3 MUX is green and its ONLINE indicator is
extinguished.
Stop! You have completed this procedure.
Advertising