Produced and consumed assembly configuration – Rockwell Automation 193-EC4 EC4 Current Monitoring Relay User Manual User Manual

Page 53

Advertising
background image

54

Rockwell Automation Publication 193-UM011A-EN-P - September 2010

Chapter 4 DeviceNet Node Commissioning

Figure 29 - Node Commissioning Confirmation Window

8.

To exit the node commissioning tool, select “Close”.

9.

To update RSNetWorx and verify that the node address is set correctly,
select “Single Pass Browse” from the Network menu.

Produced and Consumed Assembly Configuration

The Input and Output Assembly format for the EC4 Current Monitoring Relay
is identified by the value in parameter 59 (Output Assembly) and parameter 60
(Input Assembly). These values determine the amount and arrangement of the
information communicated to the master scanner.

Advertising