ADS Environmental Services Portable FlowShark Pulse QR 775006 A2 User Manual

Page 62

Advertising
background image

Installation 3-25

Attaching the lower front clamp element

6. Screw the upper rear clamp element to the upper front clamp element using

both M5 Allen head screws.

Connecting the upper rear and upper front clamp element

7. Subsequently attach the lower rear clamp element to the upper rear clamp

element using the two remaining M5 Allen head screws. Apply a minimum
torque of 6 Nm to tighten the screws to ensure the connection is secure.

Advertising