2 monitor and control unit positioning, Monitor and control unit positioning, Installation – ARAG Bravo 400S Crop sprayer User Manual

Page 7

Advertising
background image

7

INSTALLATION

MONITOR

RCU

5.2

Monitor and control unit positioning

• The BRAVO 400S series computer must be placed in the control cabin of the farming machine. Observe the following precautions:

- Do NOT install the monitor in areas where it would be subjected to excessive vibrations or shocks, to prevent any damage or
accidental use of the control keys;
- Install the device in a visible position within easy reach by hand; bear in mind that the monitor should not obstruct the
operator’s freedom of movement or block his view.

• Control unit (RCU): secure the control unit on the back of the machine, close to the control unit and the hydraulic unit.

Consider all necessary connections of the computer (Fig. 4 and Fig. 5), the cable length, and make sure there is enough space for
connectors and cables.
An identification symbol is located next to each connector to indicate its function.
For any reference to the system configuration read par. 5.1.

Fig. 4

ITEM

CONNECTION POINTS

MONITOR

1

SD memory card

2

USB (2)

3

GPS receiver

4

Cameras +

External main control

5

Connection

monitor / switch box

6

Control panel power supply +

RCU connection

RCU

7

Monitor

8

Power supply + sensors

9

Control unit

10

Hydraulic unit

Fig. 5

Advertising