Sanyo KH2442 / CH2442 User Manual

Page 195

Advertising
background image

1

2

3

4

Section

SM830082

IV - 39

SM830082

4. Service procedures

(9) Items to Check Prior to Test Run

S4. Capacity code

1

ON

ON side

2094_C_I

OFF side

S4 (green or Blue) capacity code
(4P DIP switch)

Outdoor control PCB

2

3

4

(1)

Turn on the power supply switch more than 5 hours before in order to charge the crank case heater.

(2)

Fully open the outdoor service valve after making the leak inspection of field connected tubing, vacuuming,

and gas charging if necessary.

(3)

Check the capacity code setting.

*

The factory setting is as shown in the table. Double check it.

*

The capacity code is set by S4 (green or blue, 4P DIP switch) on outdoor control PCB.

No.

Outdoor PCB

Model No.

1

2

3

4

24 type

ON

ON

ON

OFF

36 type

OFF

ON

OFF

ON

48 type

ON

ON

OFF

ON

Advertising