Safety, Additional safety information, Safety additional safety information – Nortel Networks BCM50 User Manual

Page 23

Advertising
background image

Regulatory information

23

Installation and Maintenance Guide

Safety

Additional safety information

The following interfaces (TNV) can be connected to the Public Switched Telephone Network in
accordance with Nortel and the local carriers installation requirements:

BCM50, CSC GATi Ports integrated (Loop Start)

BCM50, CSC ADSL Port option

Expansion Unit, Digital Trunk Module (T1/E1/ISDN)

Expansion Unit, Global Analog Trunk Module 4 and 8 Port (Loop Start)

Expansion Unit, CTM4/8 (Loop Start)

Expansion Unit, 4x16 (Loop Start)

Expansion Unit, G4x16, G8x16 (Loop Start)

Warning:

Only qualified service personnel may install this equipment. The instructions in this
manual are intended for use by qualified service personnel only.

Warning: Risk of shock.

Ensure the BCM50 is unplugged from the power socket and that any telephone or
network cables are unplugged before opening the BCM50.

Read and follow installation instructions carefully

Warning: Only qualified persons should service the system.

The installation and service of this hardware is to be performed only by service
personnel having appropriate training and experience necessary to be aware of hazards
to which they are exposed in performing a task and of measures to minimize the danger
to themselves or other persons.

Electrical shock hazards from the telecommunication network and AC mains are
possible with this equipment. To minimize risk to service personnel and users, the
BCM50 system must be connected to an outlet with a third-wire Earth.

Service personnel must be alert to the possibility of high leakage currents becoming
available on metal system surfaces during power line fault events near network lines.
These leakage currents normally safely flow to Protective Earth through the power cord.
Therefore, it is mandatory that connection to an earthed outlet is performed first and
removed last when cabling to the unit. Specifically, operations requiring the unit to be
powered down must have the network connections (exchange lines) removed first.

Advertising