Chapter 7 Installing the main unit

85

Installation and Maintenance Guide

To install a BCM50 unit on top of another unit

1

Insert the power supply retention clip into the BCM50 unit.

2

Place the BCM50 unit on top of the other unit. Make sure the feet of the unit are in the slots on
the top of the unit and in front of the slots. See the figure

BCM50 unit slots and feet

on page

85.

3

Slide the unit back until it clicks in place on the slots.

4

Continue with the procedure

To install the power supply on the rack-mount shelf

on page 85

.

Figure 37 BCM50 unit slots and feet

To install the power supply on the rack-mount shelf

1

Place the power supply behind the BCM50 units on the back of the rack-mount shelf.

Make sure the power supply is on its side with the label facing the back of the shelf.

2

Use two cable ties to secure the power supply to the rack-mount shelf.

3

Repeat steps 1 and 2 for each power supply you mount.

To install the patch panel (optional)

1

Determine the location in the rack where you want to install the patch panel.

2

Position the patch panel in the rack.

3

Align the holes in the patch panel with the holes in the equipment rack rails.

4

Fasten the patch panel to the rack using the four rack screws (supplied with the patch panel).

5

Continue with the procedure

To connect the cables to the patch panel (optional)

on page 113

.