15

Step 2, Contact Test

1. Meter setting: R x 1.

2. Connections: #1 & #2.

3. Correct meter reading:

Zero for all models.
B. F.E. Blue Relay - Solid State

1

3

– 1 HP QD Control Boxes

Used from 1994 until present time:

Step 1, Triac Test

1. Meter setting: R x 1,000.

2. Connections: Cap and B terminal.

3. Correct meter reading: Infinity for all

models.

Step 2, Coil Test

1. Meter setting: R x 1.

2. Connections: L1 and B.

3. Correct meter reading:

Zero ohms for all models.