Centripro or square "d" switches, Pressure swit ch ad jus tment check out, Caution – Xylem GSSERVICE R2 Service Manual Submersible Pumps & Jet Pumps User Manual

Page 85

Advertising
background image

83

!

CAUTION

To avoid damage, do not exceed

maximum allowable system pressure.

Check switch operation after re-setting.

CentriPro or Square "D"

Switches

Adjust in proper sequence:
1. CUT-IN: Turn nut down for higher cut-in

pressure, or up for lower cut-in.

2. CUT-OUT: Turn nut down for higher

cut-out pressure, or up for lower cut-out.

Adjust in proper Sequence:
1.
CUT-IN: Turn range nut down for higher

cut-in pressure, or up for lower cut-in.

2. CUT-OUT: Turn differential nut down for

higher cut-out pressure, or up for lower

cut-out.

Note: Adjustment to range (cut-in) nut will

also change cut-out pressure.

Grounding

Provisions

#8-32 screws

Range: adjust

for cut-in point

Differential: adjust

for cut-out point

ADJUSTMENT

Line

L1

Load

Load

Line

L2

PRESSURE SWIT

CH
AD
JUS

TMENT

CHECK

OUT

Advertising