Line leak test requirements & notes: 12, Table 12.1 24 hour time input format 12 – Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, & 508) Setup Programming Guide User Manual

Page 78

Advertising
background image

12

Page

12 - 2

Tank Sentinel Setup Programming Guide

Line Leak Test Requirements & Notes:

1) Inform the Site Personnel to: (If the store closes at night - not 24-hour) Leave the

Pump Controllers power on at night with dispenser power off. The Submerged
Turbine Pump (STP) must be able to turn on to run the pressurized line leak tests.

2) It is recommended that Line Leak Tests and Tank Leak Tests should not be

scheduled to run at the same time. See Chapter 8 for Tank Leak Test scheduling.

3)

Note:

The 0.2 gph Line Leak Test will normally finish during

quiet-times

between

product dispensing. (The line leak detector may start the pump at any time to run
pressurized line leak tests.)

4) The 0.1 precision line leak test requires 4 hours of

quiet-time

(after the final

dispense) before it will run successfully. Make sure to take this into account
when scheduling a Annual precision 0.1 Line Leak Test.

5)

Note:

See the TS-LLD Manual or consult INCON Technical Service for Special

Applications (for example: manifolded lines, nonstandard pumps, etc.).

6) Before programming, reference the State and Local Regulations about line leak testing,

type / precision of the tests, test frequency, and reporting requirements... adhere to
these requirements.

— Your Notes —

TABLE 12.1

24 Hour Time Input Format

HH:MM:SS

00:00:00 = midnight

22:00:00 = 10 pm + 12 ( hours )

( add 12 hours to pm times starting at 1 pm to 11:59 pm

)

02:05:00 = 2:05 am

Type /

Precision

Monthly

Compliance

Annual /

Yearly

Line Leak
Test

0.2 gph 0.1

gph

Advertising