Communication manual 8400 motec PROFINET

Commissioning

Before initial switch-on

26

L

EDS84DMOTPNET EN 2.0 - 11/2011

6

Commissioning

During commissioning, system-related data such as motor parameters, operating

parameters, responses, and parameters for fieldbus communication are defined for the

controller. For Lenze devices, this is done via the codes.
The codes of the controller and communication are saved non-volatilely as a data set in the

memory module.
In addition to codes for the configuration, there are codes for diagnosing and monitoring

the nodes.



Parameter reference

( 73)

The data from the controller or the memory module can only be read with the main voltage

supply (400/500 V AC).
For commissioning with 24 V DC, only the data of the digital and analog inputs in the last

two data words are valid and readable (see

Process input data AI/DI (Slot2)

( 44)

).

6.1

Before initial switch-on

Stop!

Before you switch on the controller for the first time, check the entire wiring for

completeness, short circuit, and earth fault.