Lenze EDB9300UES User Manual

Page 67

Advertising
background image

Technical Data

62

BA8230

Fig. 32: Layout of BDE in the door (Cubicle earthed against HF)


Note:

When the control unit is installed in the cubicle door it is essential that the door hinges
are bridged with straps to conduct HF.

Any paint on the contact points between the support frame and the door panel must
be removed. We recommend the control unit should also be earthed to the frame
using an earth strap

1)

, e.g. copper plate 20 x 0.15 mm.

In protection classes

IPx3 the contact surface

2)

of the BDE is to be sealed with 1K

sealant.

Show/Hide Bookmarks

Advertising