Lenze EDB9300UES User Manual
Page 92
Advertising
![background image](/manuals/566237/92/background.png)
Transport, Installation and Connection
BA8230
87
Connection instructions, control cables
The correct EMC connection of control cables to the 8230 frequency inverter control
board is to be made as shown in Fig. 45.
Fig. 45: Control connection, terminal strip A10 : X15 (Control board)
Show/Hide Bookmarks
Advertising