Mechanical installation

Motor mounting

4

l

100

EDK82MV371 DE/EN/FR 7.0

EMC−compliant wiring
Conditions for trouble−free operation:

ƒ Except for the mains cable, use shielded cables only.
ƒ Carefully connect the shielding to PE.
ƒ Connect motor and mains PE conductors to separate PE terminals.

Fig. 4−5

A

F

B

X1

E

D

X2

C

8200mot151

Shield connection:
1. Prepare the cable

2. Insert the cable tie

3. Lay the cable into the

cable tie and tighten it.
The shield must be
tightly connected to
the shield sheet.

0

Mains cable L1, N, PE or L1, L2, PE

1

PE connection for mains cable

2

PE connection for motor

3

Shield connection, control cable ( fix the shield tightly to the sheet with the cable tie)

4

Shielded control cable

5

Function module

X1

Terminal strip mains connection

X2

Terminal strip motor connection

PES

HF shield connection by large surface connection to PE