Commissioning

Before switching on

7

l

107

EDK82MV371 DE/EN/FR 7.0

7

Commissioning

Before switching on

)

Note!

ƒ

Do not change the switch−on sequence.

ƒ

In the event of a fault during commissioning please see the chapter
"Troubleshooting and fault elimination".

In order to avoid personal injuries or material damage, check the following before
connecting the mains voltage:
ƒ The wiring for completeness, short circuit, and earth fault
ƒ The "emergency stop" function of the system
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage

of the controller.

ƒ If no function module is used, the FIF cover has to be fitted (delivery status).
ƒ If the internal voltage source X3/20, e.g. of the standard I/O is used, terminals X3/7

and X3/39 have to be bridged.