Operation, Startup and initial preparation, Connections – Welch Allyn 1500 Patient Monitor v.1.4.X - User Manual User Manual

Page 21: 3 - operation

Advertising
background image

3

17

Operation

Startup and initial preparation

Connections

1.

Connect the mains cable to the rear of the monitor (a).

2. If the monitor is to be networked (with the Acuity Central Station), connect the

network cable to the ethernet connector on the rear of the monitor (b).

3. Connect the potential equalization (ground) cable to the central potential equalization

lug (c).

WARNING

Danger of electrical shock. Do not operate the monitor if the ground

connection is suspect or if the mains lead is damaged or suspected of being
damaged.

WARNING

Network the monitor to an Acuity Central Station only. Connecting to

other networks could damage the monitor or injure the patient. If in doubt about
the network jacks or devices, consult your facility’s Biomedical Engineering
Department.

Caution

Ensure that the patient or any person with simultaneous patient

contact does not come in contact with conductive parts of any connectors
including the RJ45 connector and the USB connector when the cover is opened.

a

c

b

Advertising