2 cable list, 3 installing the smartcontroller – Adept s350 Cobra User Manual

Page 24

Advertising
background image

Chapter 3: System Cable Installation

3.2 Cable List

Table 3-1. Cables and Parts List

Cable Description

Notes

IEEE 1394 Cable, 4.5 M

Standard cable—supplied
with system

XSYS Cable, 4.5 M
(for MB-40R)

Standard cable - supplied with
MB-40R

eAIB XSYS Cable, 4.5 M
(for eMB-40R)

Standard cable - supplied with
eMB-40R

eAIB XSLV Adapter Cable, 250 mm
(for eMB-40R with old XSYS cable)

Standard for MB-40R to eMB-
40R upgrade.

Front Panel Cable

Supplied with Front Panel

T1/T2 Pendant Adapter Cable
(for SmartController CX)

Supplied with optional T2
pendant

T20 Pendant Adapter Cable
(for SmartController EX)

Supplied with optional T20
pendant

Power Cable Kit - contains 24 VDC and AC
power cables

Available as option

XIO Breakout Cable, 12 inputs/
8 outputs, 5 meters

Available as option—see XIO
Breakout Cable on page 47.

Y Cable, for XSYS cable connections to dual
robot (for SmartController)

Available as option

3.3 Installing the SmartController

Refer to the

Adept SmartController User's Guide

or

Adept SmartController EX User's Guide

for

complete information on installing the Adept SmartController. This list summarizes the main
steps.

1. Mount the SmartController.

2. Install the Front Panel. The Front Panel must be outside of the work area, but near the

work area.

3. Connect the Front Panel to the SmartController.

4. Connect the optional pendant (if included) to the SmartController.

5. Connect user-supplied 24 VDC power to the controller. Instructions for creating the

cable, and power specifications, are covered in the

Adept SmartController User's Guide

or

Adept SmartController EX User's Guide

.

6. Install a user-supplied ground wire between the SmartController and ground.

7. Install the Adept ACE PC software on the user-supplied PC (see the following section).

Adept Cobra s350 User's Guide, Rev. D

Page 24 of 94

Advertising