Chapter 5: System Operation

Mechanical Checks

l

Verify that the robot is mounted level and that all fasteners are properly tightened

l

Verify that any end-of-arm tooling is properly installed

l

Verify that all other peripheral equipment is properly installed, such that it is safe to
turn on power to the robot system

System Cable Checks

Verify the following connections:

l

Front Panel to the SmartController

l

Optional pendant to the SmartController

l

User-supplied 24 VDC power to the controller

l

User-supplied ground wire between the SmartController and ground

l

IEEE 1394 cable between the SmartServo connector on the SmartController (1.1 for the
CX, any for the EX) and the SmartServo connector on the MB-40R/eMB-40R.

l

MB-40R: XSYS cable between the XSYS connector on the SmartController and the MB-
40R XSLV safety interlock connector, and latching screws are tight.

eMB-40R: eAIB XSYS cable between the XSYS connector on the SmartController and the
eMB-40R XSYSTEM safety interlock connector, and latching screws are tight.

or

XSYS cable into an eAIB XSLV Adapter, into the eMB-40R XSYSTEM connector.

l

User-supplied 24 VDC power to the MB-40R/eMB-40R 24 VDC connector

l

User-supplied 200/240 VAC power to the MB-40R/eMB-40R 200/240 VAC connector

User-Supplied Safety Equipment Checks

Verify that all user-supplied safety equipment and E-Stop circuits are installed correctly.

System Start-up Procedure

After the system installation has been verified, you are ready to start up the system.

1. Switch on AC power to the MB-40R/eMB-40R.

DANGER: Make sure personnel are skilled and
instructed - refer to the

Adept Robot Safety Guide

.

2. Switch on the 24 VDC power to the MB-40R/eMB-40R.

3. Switch on the 24 VDC power to the controller.

The Status Panel displays OK. The Status LED will be off.