Dlp-737 – ADC Release 3.1 User Manual

Page 206

Advertising
background image

1152700

Issue 1

February 2001

Section 2 Operation and Maintenance

Page 2-186

2000, ADC Telecommunications, Inc.

DLP-737

Page 3 of 8

15. The system now attempts to verify the new NE is connected correctly over both ring

directions, indicated by the pointer on step 15 of the Task Overview window. The
“Discovering Network” message window appears as shown in

Figure 737-12

. Discovery

verifies the physical connectivity between the nodes and should take less than ten seconds.

16. The system now restores all traffic across both ring directions through the new NE.

Subsequently, the “Add NE” task is complete and the topology is updated as per step 17 of
the Task Overview window. The system responds with a message window indicating that it
is updating the network topology and to please wait. Refer to

Figure 737-14

.

18. The user will be prompted to save the new icon layout. Refer to

Figure 737-15

. To do this,

select the disk icon on the tool bar above the work area or select the File pull down menu
and Save Icon Layout or by entering Alt+F followed by an Alt+S on the keyboard. Refer to

Figure 737-16

.

19. The user may now provision the new node per

NTP-006

.

Stop! You have completed this procedure.

Cellworx Vision Subnetwork Management System

File Configuration Fault Performance

Software

NMIC Platform

Topology

Time and Date

Connection

10966-E

Refresh...

Remove Expansion Shelf Network Element

Remove Ring Network Element

Add Expansion Shelf Network Element

Add Ring Network Element

Force Network Discovery ...

Turn Up Ring...

Revert to Saved Icon Layout...

Ring Audit
Ring Upgrade

Figure 737-1. Cellworx Vision Configuration Pull Down Menu

Advertising