ADC Release 3.1 User Manual
Page 56
Advertising
ADCP-70-220
•
Issue 1
•
November 2000
•
Section 2 Operation and Maintenance
Page 2-26
© 2000, ADC Telecommunications, Inc.
NTP-011
Page 1 of 1
CONDUCT ACCEPTANCE TESTS ON A CELLWORX STN NODE
Summary: This procedure lists the test that can be performed on a newly installed Cellworx
STN node whether installed as a ring node or terminal node.
SONET Diagnostics
DLP-766
Initiate a Protection Switch
DLP-771
Perform Loopback Tests
DLP-772
Initiate a Card Reset
DLP-773
Execute an Alarm Cut Off (ACO)
DLP-776
Advertising