Perform a peak test with the dummy cell

For testing the peak measurement, the dummy cell of the 757 VA
Computrace Stand is used with the test method

Test757_D.mth

.

Proceed as follows:

1. Click on

or

MAIN WINDOW

/ Mode / Determination

.

2. Click on

or

MAIN WINDOW

/ Window / Working method

specification

to open the

WORKING METHOD SPECIFICATIONS

window.

3. Click on

or

MAIN WINDOW

/ File / Load method

.

4. Select the method file

Test757_D.mth

in the

OPEN

window and

click

<OK>

. The method is loaded into the

WORKING METHOD

SPECIFICATIONS

window.

5. Connect the dummy cell at the 757 VA Computrace Stand: At-

tach electrode cable AE to clamping screw

AE, attach elec-

trode cable RE to clamping screw

RE, attach electrode cable

WE to clamping screw

WE-D.

6. Click on

or

MAIN WINDOW

/ Window / Monitor

to open the

MONITOR

window.

7. Start the measurement by clicking the

icon in the

MAIN

WINDOW

or the

button in the

MONITORING

window.

8. Enter the

Sample ID

(used as part of the determination file

name) in the

PLACE SAMPLE

window and click

<OK>

.

9. At the end of the measurement, a curve is printed out. This

curve should satisfy the following conditions:

• A symmetrical, gaussian-shaped peak should be

plotted. The evaluation must provide a result for the
peak voltage and the peak current, which are printed
out in the full report.

• The peak voltage E should be -450 … -550 mV.