Figure 4.16 - FT-10 Outputs connection diagram

Standard Output:
Only one set point value is entered. The
output state is forced active high when the
weight is higher than SP1, else the output is
passive.
Refer to parameter [ 131 ] on Page 29.

Threshold Output:
2 set point values are entered. SP1 is the
point that the output goes active when the
weight increased from SP1_H. SP1_L is the
point that the output drops to passive state
when the weight decreased to SP1_L.
Inverse function is available.
Refer to parameter [ 7-- ] on Page 36

.

Window Output:
2 set point values are entered. The output is
active when the weight is between SP1_L
and SP1_H. Inverse function is available.
Refer to parameter [ 7-- ] on Page 36.

4.4 Commissioning

PRECAUTION:

Please read this manual carefully before energizing the instrument. Perform the

commissioning operation according the procedure given in this section. Only trained person is allowed for
cleaning, commissioning, checking and servicing of the instrument. The interference of untrained person
may cause some unwanted damages or injuries.
Before power on the instrument, please make the required mechanical and electrical installations. After
power on, you have to program your FT-10 before field bus interfacing.
Install IndFace1X to your PC. IndFace1X software is used for easy programming, calibration and testing of
FT-10 instruments.
After checking the performance of instruments with IndFace1X, you can begin to use FT-10 in your