Boom sensor calibration position 9 -76 – JLG 1100SB Service Manual User Manual
Page 360
Advertising
SECTION 6 - JLG CONTROL SYSTEM
6-76
– JLG Lift –
3121265
Press Enter. The screen will read:
31.
Telescope to the yellow witness mark (controller will
be close - operator must position the pointer to cen-
ter line on decal within 0.25" [6 mm]) for Calibration
Position 9.
When the boom is in the proper position, hit Enter.
The screen will read:
When Position 9 calibrating is complete, the screen
will read:
Figure 6-22. Boom Sensor Calibration Position 9
Advertising