3 preparing for commissioning, 4 connect 24 vdc supply voltage, 7commissioning – Pilz PMCprotego D.72/000/0/0/2/208-480VAC User Manual
Page 183: 2 commissioning the servo amplifier

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
7-5
7.2
Commissioning the servo amplifier
7
Commissioning
S1: Switches on 24 VDC supply voltage
S2: Enables the servo amplifier (hardware enable)
S3: Switches on mains contactor, provides mains voltage to servo
amplifier
K1: Mains contactor
A1: Mains contactor 24 V +
A2: Mains contactor 24 V -
Wire components
24 VDC supply voltage (“+” to X4/1 via S1 switch and “-” to X4/3)
Enable hardware: Connect 24 VDC to terminal X3/1 via S2 switch
Mains contactor K1
– Connect A1 terminal to X3/14 via S3 switch
– Connect A2 terminal to XGND on the supply voltage
“STO-ENABLE deactivated” mode: Link terminals X4/1 und X4/7
Voltage for relay contact for operational readiness BTB/RTO: Link ter-
minals X4/7 and X3/15
Wire the main contacts of the mains contactor: connect to mains volt-
age and the terminals at X0
Connect servo motor to X8 terminals
Connect resolver to X2 sockets
Connect motor holding brake to X9A terminals
Connect external brake resistor to X8 terminals
7.2.3
Preparing for commissioning
Preparing for commissioning
7-
][Inbetrieb_vorbereiten_protego_D
Prepare the servo amplifier for commissioning:
The mains voltage and supply voltage are switched off.
A personal computer with the commissioning software installed is
connected.
An enable device in accordance with EN 292-1 is connected.
The ENABLE input on the servo amplifier has a “0” signal. The servo
amplifier is not enabled.
7.2.4
Connect 24 VDC supply voltage
Connect 24 VDC supply voltage
7-
][Inbetrieb_Versorgung_protego_D
1. Switch on 24 V power supply
Connect 24 VDC to the servo amplifier's control element (X4).