Chapter 2. installation, 1 unpacking and inspection – Comtech EF Data CLO-10 User Manual

Page 39

Advertising
background image

Chapter 2. INSTALLATION

2.1

Unpacking and Inspection

The CLO-10 Link Optimizer and its Installation and Operation Manual are packaged and shipped in
a pre-formed, reusable cardboard carton containing foam spacing for maximum shipping protection.

CAUTION

IMPORTANT

Do not use any cutting tool that will extend more than 1” into the container
and cause damage to the unit.

Be sure to keep all shipping materials for the carrier's inspection.

Unpack and inspect the CLO-10 as follows:

Step

Procedure

1

Inspect shipping containers for damage. If shipping containers are
damaged, keep them until the contents of the shipment have been
carefully inspected and checked for normal operation.

2

Remove the packing list from the outside of the shipping carton.

3

Open the carton by cutting the tape at the top of the carton (indicated by

OPEN THIS END

).

4

Remove the cardboard/foam space covering the CLO-10. Remove the
CLO-10, manual and power cord from the carton.

5

Check the contents against the packing list to verify completeness of the
shipment.

6

Inspect the equipment for any possible damage incurred during shipment. If
damage is evident, contact the carrier and Comtech EF Data immediately
and submit a damage report.

7

Refer to the following sections for further installation instructions.

2–1

Advertising