2 rack mounting – PLANET WGSW-5242 User Manual

Page 29

Advertising
background image

User’s Manual of WGSW-5242

29

Figure 2-4

Place the Managed Switch on the desktop

Step3:

Keep enough ventilation space between the Managed Switch and the surrounding objects.

When choosing a location, please keep in mind the environmental restrictions discussed in Chapter

1, Section 4, and Specification.

Step4:

Connect the Managed Switch to network devices.

Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports on the front of the Managed Switch

Connect the other end of the cable to the network devices such as printer servers, workstations or routers…etc.

Connection to the Managed Switch requires UTP Category 5 network cabling with RJ-45 tips. For

more information, please see the Cabling Specification in Appendix A.

Step5:

Supply power to the Managed Switch.

Connect one end of the power cable to the Managed Switch.

Connect the power plug of the power cable to a standard wall outlet.

When the Managed Switch receives power, the Power LED should remain solid Green.

2.2.2 Rack Mounting

To install the Managed Switch in a 19-inch standard rack, please follows the instructions described below.

Step1:

Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.

Step2:

Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.

Figure 2-5

shows how to attach brackets to one side of the Managed Switch.

Advertising