Suppose you have a category called Fillers to fill these small gaps in the schedule. Select Fillers from
the Category drop-down list. Set the Min Duration to 5 minutes and the Max Duration to 15
minutes.

Click Search. The results are displayed in the Search Results section.

Search Results

Search Results displays thumbnails of content that was found during the search. To schedule the
content, drag the thumbnail to an open slot in the schedule. Continuing the example above, you could
drag School Board Video onto the schedule and reduce the 15-minute gap to 10 minutes.

External Sources

To schedule an event through an external source, such as a switch event, drag the source from the
External Sources list to an open slot in the schedule. If the event does not have a prescheduled
duration, click on Modify to set the duration.

Clicking on Modify opens the applicable scheduling screen. In this example, the Schedule Switch
screen opens. Change the Duration and click the Save button.

Scheduling Events Using the Actions on the Grid

Several event actions are available on the schedule grid in Calendar View. These actions let you
schedule events in a way similar to the method used in Classic View. Only the options available on
your TelVue

®

server are displayed on the schedule grid.

1. To schedule a playout, click on Content. This opens the Schedule Playout screen and fills in the
start time.

2. To schedule a stream event, click on Live Stream Source. This opens the Schedule Live Stream
Event
screen and fills in the start time.

3. To schedule a switch event, click on External Source. This opens the Schedule Switch screen and
fills in the start time.

Import/Export functions such as copying blocks of a schedule also must be done in Classic View.

You are free to use Classic View or Calendar View – or both – to schedule programming for your
server. Use whichever method is convenient.

Reports Tab


The Reports page offers on-screen reports for the server system, and includes:

As Run Report

Missing File Report

Program Guide Report

As Run Report

The default view is the As Run Report, which shows all events that have run on the application,
beginning with the oldest.