2 wiring for analog output, Caution, 3 mounting of cable gland – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 59: 1 cable specifications, 2 wiring procedure

Advertising
background image

IM 11M13A01-04E

5-3

5. Wiring

5.1.3

Mounting of Cable Gland

For each wiring inlet connection of the equipment, mount the conduit appropriate for the
screw size or a cable gland.

25

F5.3E.EPS

Cable gland

Rc1/4 or 1/4NPT
(Reference air inlet)

Rc1/4 or 1/4NPT
(Calibration gas inlet)

M20

ϫ

1.5, 1/2 NPT or the like

(Wiring connection)

Unit: mm

Figure 5.3 Cable Gland Mounting

5.2

Wiring for Analog Output

This wiring is for transmitting 4 to 20mA DC output signals to a device, e.g. recorder.
Maintain the load resistance including the wiring resistance of 550

⍀ or less.

+

-

AO(+)

AO(

-

)

FG

F5.4E.EPS

Shielded cables

Analyzer

Receiver

Figure 5.4 Wiring for Analog Output

5.2.1

Cable Specifications

Use a 2-core shielded cable for wiring.

5.2.2

Wiring Procedure

(1) M4 screws are used for the terminals. Use crimp-on terminals appropriate for M4

terminal screws for cable connections. Ensure that the cable shield is connected to
the FG terminal of the equipment.

(2) Be sure to connect (+) and (-) polarities correctly.

CAUTION

• Before opening the detector cover, loosen the lock screw. If the screw is not loosened

first, the cover will be improperly engaged to the body, and the terminal box will
require replacement. When opening and closing the cover, remove any sand particles
or dust to avoid gouging the thread.

• After screwing the cover on the equipment body, secure it with the lock screw.

Advertising