Replacement of heater assembly

Refer to Figure 11.4 as an aid in the following discussion.
Remove U-shaped pipe support

, U-shaped pipe , Filter and the sensor (cell) , following

Section 11.1.2, earlier in this manual.
Remove the two screws

that tighten the cover and slide it to the flange side. Remove the four

bolts

to remove the converter . Then remove the three connectors to which leadwire from the

heater and thermocouple is connected.
Loosen screw

until heater assembly  plate can be removed. There’s no need to remove O-ring

which prevents screw

from dropping out. Pull out connector . Loosen and remove the screw

with a special wrench (part no. K9470BX or equivalent) and then remove the heater assembly

 from

the detector

.

To reassemble the heater assembly, reverse the above procedure:
Insert the heater assembly

 into the detector , while inserting the calibration pipe in the detector

 into the heater section in the heater assembly  as well as in the bracket hole. Coat the screw

with grease (Never-Seez: G7067ZA) and tighten the screw

with a special tool (part no. K9470BX or

equivalent) with a tightening torque of 12N·m ± 10%.
Next, to install the O-rings

on the calibration-gas and reference-gas pipes, disassemble the

connector

in the following procedure:

First, remove the screw

 and then remove the plate and two caps . If the O-ring remains

in the hole, pull them out from the back. Pass the heater and thermocouple leadwire through the

connector

. Also, pass the calibration gas and reference gas pipes through the opening of the

connector

. If the O-ring fails, replace it with a new one.

Push the two caps

into the associated opening of the connector . Insert the plate , aligning it

with the groove of the cap

, and tighten it with the screw . If you attempt to insert the calibration

gas and reference gas pipes into the connector

without disassembling the connector , the O-ring

may be damaged. Tighten screw

in the heater assembly  until connector can’t move.

Reassemble in reverse order to the above disassembly procedure.
When installing the cell assembly

, replace the metal O-ring with a new one.

11.1.4 Replacement of Dust Filter

Set the dust filter

in place using a special pin spanner (with a pin 4.5 mm in diameter: part no.

K9471UX or equivalent). If a dust filter that has already been replaced once is used again, apply

grease (Never-Seez: G7067ZA) to the threads of the dust filter.

11.1.5 Replacement of O-ring

The detector uses three different types of O-rings

, , and . One O-ring alone , or two O-rings

 and are used. (For a pressure compensating model, two O-rings are used for individual uses.

Two O-rings

 and are used for reference gas sealing and require periodic replacement.

11.1.6 Stopping and Re-starting Operation