3 installation of zr20h automatic calibration unit, 1 installation location, 2 mounting of zr20h automatic calibration unit – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 46: Installation location -7, Mounting of zr20h automatic calibration unit -7

Advertising
background image

<3. Installation>

3-7

IM 11M12A01-04E

(2) Mount the flow setting unit. Remove the pipe mounting parts from the mount fittings of the flow

setting unit and attach the unit securely on the wall with four screws.

F3.14E.ai

Figure 3.14

Wall mounting

3.3 Installation of ZR20H Automatic Calibration Unit

3.3.1 Installation Location

The following should be taken into consideration:

(1) Easy access to the unit for checking and maintenance work.

(2) Near to the detector and the converter

(3) No corrosive gas.

(4) An ambient temperature of not more than 55°C and little change of temperature.

(5) No vibration.

(6) Little exposure to rays of the sun or rain.

3.3.2 Mounting of ZR20H Automatic Calibration Unit

ZR202G -  -  -  -  - A or B is shipped with automatic calibration unit attached.
The automatic calibration unit includes flowmeters and solenoid valves, so as to ensure reliable and

accurate operation – Flowmeter should be mounted vertically. The associated probe is designed for

horizontal or vertical mounting.
If you buy the automatic calibration unit afterward, and need to install it or replace it, contact our

service representative.

Advertising