<4. Display and Operations while Connected to GC8000>

4-60

IM 11B06C01-01E

4.5.6

Calling up Re-integration Window from Analysis

Results Window

l

Re-integration from the Concentration Analysis Results window and Retention

Time History window

The Chromatogram Re-integration window can be called from the Analysis Results window by

performing the following operations at user level C+.
(1) While the Concentration Analysis Results window and Retention Time History window

appear, left double-click “Peak concentration” or “Peak retention time” you want to re-

integrate, or select “Re-integration” in the menu at right.

In the Chromatogram Re-integration window started up then, the selected “Peak” has

already been selected as the re-integration target.

(2) While the Concentration Analysis Results window and Retention Time History window

appear, left double-click “Analysis start date and time” including the peak concentration or

retention time you want to re-integrate, or select “Re-integration” in the menu at right.

In the Chromatogram Re-integration window started up then, all peaks in “Analysis start

date and time” have already been selected as the re-integration target.

CAUTION

If the Concentration Analysis Results window and Retention Time History window display GCM,

and the Chromatogram Re-integration window is called from “Analysis start date and time”, the

system select box appears. Select and determined the system number. If only a single target

GCM is in the system, the system select box does not appear.

Figure 4.74