2 installing aset-g, 3 check the aset-g communication with the pcas-g, Installing aset-g -3 – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 179: Check the aset-g communication with the pcas-g -3

Advertising
background image

<8. ASET for ARCNET>

8-3

IM 11B06C01-01E

8.2.2

Installing ASET-G

Install the ASET-G according to “Installing the Engineering Terminal”.

8.2.3

Check the ASET-G communication with the PCAS-G

(1) Start the ASET-G, and a dialog box to set the IP address of the PCAS-G appears.

(2) Enter Server ID and IP address, and click ‘connect’ button. Check if the Overview Window of

the ASET-G appears.

(3) Overview Window shows each of the analyzer’s operation status.

5th Edition : Nov. 16, 2011-00

Advertising