Test from the ground station, Test from the ground station -53 – JLG 510AJ Service Manual User Manual

Page 335

Advertising
background image

SECTION 6 - JLG CONTROL SYSTEM

3121181

– JLG Lift –

6-53

Test from the Ground Station

1.

Position the Platform/Ground select switch to the
Ground position.

2.

Plug the analyzer into the connector inside the Ground
control box.

3.

Pull out the Emergency Stop switch. and Start the
engine.

4.

The analyzer screen should read:

5.

Use the arrow button to reach SYSTEM TEST. Hit Enter.
The analyzer will prompt you asking if you want to acti-
vate the system test; hit Enter again to activate.

6.

Follow flow path in Figure 6-20., System Test Flow Chart
- Ground Station Tests an
d go through component tests.
Hit ESC key during any part of the test to return to the
main menu without completing all tests or wait until all
tests are complete. During TEST ALL INPUTS sequence,
the analyzer allows control switches to be operated and
shows if they are closed (CL) or open (OP).

Advertising