Output carrier disassembly, Output carrier disassembly -6 – JLG 510AJ Service Manual User Manual

Page 48

Advertising
background image

SECTION 3 - CHASSIS AND TURNTABLE

3-6

– JLG Lift –

3121181

Output Carrier Disassembly

1.

Using a small diameter punch, Drive Roll Pin (4G) which
holds Planet Shaft (4E) in Carrier (4A) into Planet Shaft
(4E) until it bottoms.

NOTE:

Make sure Roll Pin has bottomed. Otherwise, damage to
carrier could occur when Planet Shaft is removed.

2.

Remove Planet Shaft (4E) from Carrier (4A). Use a small
punch to remove Roll Pin (4G) from Planet Shaft (4E).

3.

Slide Planet Gear (4F) and two Thrust Washers (4B) out
of Carrier (4A).

4.

Remove 15 needle Bearings (4C) from bore of Planet
Gear (4F).

5.

Repeat steps 1 through 4 for two remaining planet
gears.

6.

Remove Thrust Washer (4H) from Carrier (4A).

7.

Using retaining ring pliers, remove Retaining Ring (4K)
from Carrier (4A). Pull Thrust Washer (4J) and Spring (4I)
out of Carrier (4A).

4G. Roll Pin

4J. Thrust Washer

4B. Thrust Washers

4F. Planet Gear

4H. Thrust Washer

4K. Retaining Ring

4C. Needle Bearings

4I. Spring

4A. Carrier

4E. Planet Shaft

Figure 3-4. Output Carrier Disassembly

Advertising