JLG 510AJ Service Manual User Manual

Page 74

Advertising
background image

SECTION 3 - CHASSIS AND TURNTABLE

3-32

– JLG Lift –

3121181

6.

Following thrust washer, place cluster gear (3F), large
end toward roll pin hole in carrier housing, on planet
shaft (3E).

7.

Following cluster gear, place one more thrust washer
(3B) on planet shaft (3E) through opposite planet shaft
hole in carrier housing (3A).

8.

Use an alignment punch or similar tool to align roll pin
holes in carrier housing (3A) and planet shaft (3E).

9.

Drive roll pin (3G) down in aligned roll pin holes in car-
rier housing (3A) and planet shaft (3E).

10.

Repeat steps 1 thru 9 to assemble and install remaining
cluster gears.

11.

At this point carrier sub-assembly is complete.

Advertising