Output carrier sub-assembly, Output carrier sub-assembly -11 – JLG 510AJ Service Manual User Manual

Page 53

Advertising
background image

SECTION 3 - CHASSIS AND TURNTABLE

3121181

– JLG Lift –

3-11

Output Carrier Sub-Assembly

1.

Place Spring (4I) into the deep counterbore of the Out-
put Carrier (4A).

2.

Place Washer (4J) on top of Spring (4I).

SAFETY GLASSES MUST BE WORN DURING THE NEXT STEP.

3.

With Retaining Ring (4K) installed on snap ring pliers,
place on top of Washer (4J) and compress Spring (4I)
until Retaining Ring (4K) is seated completely in groove.

4.

Apply a liberal coat of grease to the bore of one Output
Planet Gear (4F).

5.

Line the inside of the Planet Gear (4F) with 15 Needle
Rollers (4C).

NOTE:

The last roller installed must be installed end wise. That is,
the end of the last roller must be placed in between the
ends of the two rollers that form the space, and then slid,
parallel to the other rollers, into place.

6.

Place Thrust Washer (4H) into the shallow counterbore
of the Output Carrier (4A).

7.

Set Carrier (4A) in an upright position.

8.

Insert a Planet Shaft (4E) into one of the planet shaft
holes on the Carrier (4A). The end of the planet shaft
that does NOT have the roll pin hole should be inserted
in the carrier FIRST.

9.

Place one Thrust Washer (4B) onto the end of Planet
Shaft (4E). Make sure the flat faces towards the inside of
the carrier and make sure the button fits in the pocket
inside the Carrier (4A).

10.

Following the thrust washer, place Planet Gear (4F) with
needle rollers, onto Planet Shaft (4E).

11.

Following the planet gear, place one more Thrust
Washer (4B) onto Planet Shaft (4E). Align the Thrust
Washer (4B) in the same manner described in Step 6.

12.

Now insert Planet Shaft (4E) through the opposite
planet shaft hole on Carrier (4A). Use an alignment
punch or similar tool to align the roll pin holes on Carrier
(4A) and Planet Shaft (4E).

SAFETY GLASSES MUST BE WORN DURING THE NEXT STEP.

13.

Drive Roll Pin (4G) down into the aligned roll pin holes.
Pin should be flush with OD of carrier.

14.

Repeat Steps 4,5, & 8-13 for the installation of the two
remaining Planet Gears (4F).

Advertising