SECTION 3 - CHASSIS AND TURNTABLE

3-34

– JLG Lift –

3121181

7.

With large end down, place disconnect cap (6D) on
cover cap (6B), aligning pipe plug hole in disconnect cap
over pipe plug hole in cover cap.

8.

Place two remaining bolts (6C) in bolt holes in discon-
nect cap (6D). Tighten bolts.

9.

Using a torque wrench, apply 36 to 49 in-lb (4 to 5 Nm)
of torque to both bolts (6C).

10.

Apply a light coat of "Never-Seize" to pipe plug (6H) and
tighten it in pipe plug hole in cover (6A).

Hub-Spindle Sub-Assembly

NOTE:

Make sure cup is square with counterbore before pressing.

1.

Set hub (1G) on large end. Press bearing cup (1C) in
counterbore in small end of hub (1G).

2.

Press nine studs (1N) in stud holes in hub (1G).